Sands Cotai Central – Sheraton Macao Hotel

Name
Sands Cotai Central – Sheraton Macao Hotel
Completion
09/2008
Location

Cotai, Macau

Client
Venetian Orient Ltd.
Consultant
Parson Brinckerhoff (Asia) Limited
Classification of Premises
The project is part of the Sands Cotai Central development in Cotai Strip. Built on top of a 7 storeys casino and retail shopping podium, the five-star Sheraton Macau Hotel comprises 37 storeys with an area of 4,500m² per floor, providing over 1800 guest rooms. The project was completed in two stages: The first was from October 2007 to November 2008 and the second stage was from March 2011 to August 2012.
Scope of  Work
Supply, installation, testing & commissioning and maintenance of HVAC, Electrical, Fire services and Plumbing & drainage services
Description
  • HVAC services including ~5,000TR air conditioning system, mechanical ventilation system, building management control system, ventilation / air conditioning control system, smoke purging system and staircase pressurization system;
  • Electrical services including LV switch board, busbar, cable and wiring system, lighting system, earthing system, UPS system, lightning protection system, cable containment for other ELV contractors;
  • Fire services including sprinkler system and standpipe (hydrant & hose reel) system;
  • Plumbing & drainage services including rain water drainage system, potable water supply system, hot water system, flushing water supply system and submersible water pump and control system.
Capacity
5,000TR